Expandable AAI Zone Cleaner and UPS Saver
When I was clearing old zones that had been mined out for AAI vehicles, I found that having one cleaner for each zone caused some UPS issues due to running several iterators in parallel. Using a battery, a switch, inserters, and careful power pole placement/wiring I was able to make this modification to run in series. This is designed to be expandable to as many zones as you have. In the screenprint I have some numbers 1. Standard Zone Cleaner including wire conditions and colors 2. Combinator to assist with easy identification of resource 3. Wired Power pole setup 4. powers the last inserter and hooks up to right side switches 5. powers the first inserter and hooks up to the left side switches. wire down powers the first zone controller 6. inserter setup including wire conditions and colors I found this later It probably (will need to test) does a better job than this print but I made this one