Search blueprints by name, author or tags. Open previews and copy strings in one click.
Blueprints
Loading...
End game Smelting Farm for 2-4 trains (16 belts)
**Inputs:** 16x belt iron/copper ore **Outputs:** 16x belt iron/ copper **Rate:** 640 items per second (Iron / Copper Plate) (16x fully saturated blue belts @ 40 items/sec) 128 items/sec (Steel) **Features:** 1,120 electric furnaces (70 furnaces X 16 belts) 16x belt balancer on output By-pass route for Input/Output station 10 train stacker at Input 10 train stacker at Output for empty incoming trains 10 train stacker at Output for full outgoing trains Fully covered with robo ports. Blueprint is self building if supplies are provided in logistics chests. **Logic:** Arithmetic Combinators are wired to train stations. Input/Output Train station is disabled when a train is present Input Train station is disabled when chests are full. Output Train station is disabled unless it can fill a 2-4 train.